In November 2008 a SIRAC High Efficiency Hot water heat pump was installed to the geyser hot water system at a hut in a National Park. A sealed kWh meter was fitted to monitor the electrical consumption. The electrical element in the geyser was disconnected. Read the rest of this entry ?
Leave a Reply
You must be logged in to post a comment.